
General Index
SMGB0091 rev.2 - 11/2015
V
4.7.4 DIP Switch setting for multiple H-LINK system
............................................................................................. 71
4.7.5 Examples of the system of connection between H-LINK and H-LINK II units
............................................... 72
4.7.6 Examples of H-LINK II system
4.8.1 RASC-(4-6)HNPE (3N~ 400V 50Hz)
4.8.2 RASC-(8/10)HNPE (3N~ 400V 50Hz)
5.2 Safety protection and control
5.3 Standard operation sequence
5.3.1 Cooling operation .......................................................................................................................................... 80
5.3.2 Dry operation ................................................................................................................................................. 82
5.3.3 Heating operation .......................................................................................................................................... 84
5.3.4 Automatic cooling and heating operation ...................................................................................................... 86
5.3.5 Defrost operation control ............................................................................................................................... 87
5.4 Standard control functions
5.4.1 Freezing protection during cooling process or dry operation ........................................................................ 89
5.4.2 Prevention control for excessively high discharge gas temperature ............................................................. 90
5.4.3 Activation for protection device control .......................................................................................................... 91
5.4.4 Preheating control of compressor ................................................................................................................. 92
5.4.5 Prevention control for high pressure increase during cooling operation ....................................................... 92
6.1.1 Input and output signals through 7-segment display on the RASC unit PCB
................................................ 94
6.2.1 Optional functions through 7-segment display on the RASC unit PCB
....................................................... 101
7.2 Test run procedure using the remote control switch (PC-ARF)
...........................................................120
7.3 Test run procedure using the remote control switch (PC-ART)
...........................................................123