GE Power Management
PQM Power Quality Meter
3-5
3 OPERATION
3.3 KEYPAD
3
3.3.5 RESET KEY
The
key is used to clear the latched alarm and/or auxiliary conditions. Upon pressing the key, the
PQM will perform the appropriate action based on the condition present as shown in the table below.
The
key, along with the
key, is also used to remove user defined default messages. Refer to
Section 3.4: DEFAULT MESSAGES on page 3–8 for further details.
Table 3–1: RESET KEY ACTIONS
CONDITION PRESENT
MESSAGE DISPLAYED
PQM ACTION PERFORMED
None
No action taken
Alarm
ALARM indicators and alarm relay remain
on because condition is still present
Aux Relay
AUXILIARY indicator(s) and aux relay(s)
remain on because condition is still present
Alarm and Aux Relay
AUXILIARY and ALARM indicators and
alarm and aux relays remain on because
condition is still present
Latched Alarm (condition no
longer exists)
No message displayed, and ALARM
indicators and the alarm relay turned off
Latched Aux Relay (condition no
longer exists)
No message displayed, and AUXILIARY
indicator and the appropriate aux relay(s)
turned off
Alarm and Latched Aux Relay
(Aux condition no longer exists)
No message displayed, and appropriate
AUXILIARY indicator(s) and aux relay(s)
turned off
Aux Relay and Latched Alarm
(alarm condition no longer exists)
No message displayed, and ALARM
indicators and alarm relay turned off
RESET
RESET NOT POSSIBLE
ALARM STILL PRESENT
RESET NOT POSSIBLE
AUX CONDITION EXISTS
RESET NOT POSSIBLE
AUX CONDITION EXISTS
R E S E T
S T O R E
Содержание Power Quality Meter Series
Страница 2: ......
Страница 4: ......
Страница 10: ...vi PQM Power Quality Meter GE Power Management TABLE OF CONTENTS ...
Страница 29: ...GE Power Management PQM Power Quality Meter 2 5 2 INSTALLATION 2 2 ELECTRICAL 2 Figure 2 3 REAR TERMINALS ...
Страница 46: ...2 22 PQM Power Quality Meter GE Power Management 2 2 ELECTRICAL 2 INSTALLATION 2 ...
Страница 56: ...3 10 PQM Power Quality Meter GE Power Management 3 4 DEFAULT MESSAGES 3 OPERATION 3 ...
Страница 166: ...6 20 PQM Power Quality Meter GE Power Management 6 6 POWER ANALYSIS 6 SOFTWARE 6 ...
Страница 274: ...B 4 PQM Power Quality Meter GE Power Management B 1 TABLES AND FIGURES APPENDIXB B ...
Страница 276: ...C 2 PQM Power Quality Meter GE Power Management C 1 PQM WARRANTY APPENDIXC C ...
Страница 281: ...GE Power Management PQM Power Quality Meter NOTES ...