GE Power Management
PQM Power Quality Meter
4-51
4 PROGRAMMING
4.5 S4 ALARMS/CONTROL
4
•
PULSE INPUT 1 RELAY: Any of the PQM switch inputs can be assigned to count pulse inputs as shown in
Section 4.3.4: SWITCH INPUTS on page 4–27. This setpoint can be used to give an indication (alarm or
control) if the programmedlevel is exceeded. Set this setpoint to
OFF
if the feature is not required. Selecting
ALARM
will cause the alarm relay to activate and display an alarm message whenever a pulse count level
equals or exceeds the selected level. Selecting
AUX1
,
AUX2
or
AUX3
activates the appropriate auxiliary relay
but no message is displayed. The
AUX1
,
AUX2
or
AUX3
selections are intended for process control.
•
PULSE INPUT 1 LEVEL: When the pulse input value accumulated in the
A1 METERING \ PULSE INPUT
COUNTERS \ PULSE INPUT 1
actual value exceeds this setpoint value, the relay assigned in the
PULSE INPUT 1
RELAY
will energize. If the
ALARM
relay is assigned, a PULSE INPUT 1 ALARM message will also be dis-
played. The units in this setpoint are determined by the
S2 SYSTEM SETUP \ PULSE INPUT \ PULSE INPUT
UNITS
setpoint.
•
PULSE INPUT 1 DELAY: This setpoint can be used to allow a time delay before the assigned relay will
energize after the
PULSE INPUT 1 LEVEL
has been equaled or exceeded.
•
PULSE INPUT 2 RELAY: See
PULSE INPUT 1 RELAY
description above and replace all references to PULSE
INPUT 1 with PULSE INPUT 2.
•
PULSE INPUT 2 LEVEL: See
PULSE INPUT 1 RELAY
description above and replace all references to PULSE
INPUT 1 with PULSE INPUT 2.
•
PULSE INPUT 2 DELAY: See
PULSE INPUT 1 RELAY
description above and replace all references to PULSE
INPUT 1 with PULSE INPUT 2.
•
PULSE INPUT 3 RELAY: See
PULSE INPUT 1 RELAY
description above and replace all references to PULSE
INPUT 1 with PULSE INPUT 3.
•
PULSE INPUT 3 LEVEL: See
PULSE INPUT 1 RELAY
description above and replace all references to PULSE
INPUT 1 with PULSE INPUT 3.
•
PULSE INPUT 3 DELAY: See
PULSE INPUT 1 RELAY
description above and replace all references to PULSE
INPUT 1 with PULSE INPUT 3.
•
PULSE INPUT 4 RELAY: See
PULSE INPUT 1 RELAY
description above and replace all references to PULSE
INPUT 1 with PULSE INPUT 4.
•
PULSE INPUT 4 LEVEL: See
PULSE INPUT 1 RELAY
description above and replace all references to PULSE
INPUT 1 with PULSE INPUT 4.
•
PULSE INPUT 4 DELAY: See
PULSE INPUT 1 RELAY
description above and replace all references to PULSE
INPUT 1 with PULSE INPUT 4.
•
TOTALIZED PULSES RELAY: A relay can be selected to operate based upon a Total Pulse Input Count
as configured in the PQM. Selecting
ALARM
will cause the alarm relay to activate and display an alarm
message whenever a pulse count level equals or exceeds the selected level. Selecting
AUX1
,
AUX2
, or
AUX3
will cause the appropriate auxiliary relay to activate but no message will be displayed. The
AUX1
,
AUX2
, and
AUX3
selections are intended for process control.
•
TOTALIZED PULSES LEVEL: See
PULSE INPUT 1 LEVEL
description above and replace all references to
PULSE INPUT 1 with TOTALIZED PULSES.
•
TOTALIZED PULSES DELAY: See
PULSE INPUT 1 DELAY
description above and replace all references to
PULSE INPUT 1 with TOTALIZED PULSES.
Содержание Power Quality Meter Series
Страница 2: ......
Страница 4: ......
Страница 10: ...vi PQM Power Quality Meter GE Power Management TABLE OF CONTENTS ...
Страница 29: ...GE Power Management PQM Power Quality Meter 2 5 2 INSTALLATION 2 2 ELECTRICAL 2 Figure 2 3 REAR TERMINALS ...
Страница 46: ...2 22 PQM Power Quality Meter GE Power Management 2 2 ELECTRICAL 2 INSTALLATION 2 ...
Страница 56: ...3 10 PQM Power Quality Meter GE Power Management 3 4 DEFAULT MESSAGES 3 OPERATION 3 ...
Страница 166: ...6 20 PQM Power Quality Meter GE Power Management 6 6 POWER ANALYSIS 6 SOFTWARE 6 ...
Страница 274: ...B 4 PQM Power Quality Meter GE Power Management B 1 TABLES AND FIGURES APPENDIXB B ...
Страница 276: ...C 2 PQM Power Quality Meter GE Power Management C 1 PQM WARRANTY APPENDIXC C ...
Страница 281: ...GE Power Management PQM Power Quality Meter NOTES ...