GE Power Management
PQM Power Quality Meter
2-1
2 INSTALLATION
2.1 PHYSICAL
2
2 INSTALLATION 2.1 PHYSICAL
2.1.1 MOUNTING
Physical dimensions and required cutout dimensions for the PQM are shown below. Once the cutout and
mounting holes are made in the panel, use the eight #6 self-tapping screws provided to secure the PQM.
Mount the unit on a panel or switchgear door to allow operator access to the keypad and indicators.
Figure 2–1: PHYSICAL DIMENSIONS
Содержание Power Quality Meter Series
Страница 2: ......
Страница 4: ......
Страница 10: ...vi PQM Power Quality Meter GE Power Management TABLE OF CONTENTS ...
Страница 29: ...GE Power Management PQM Power Quality Meter 2 5 2 INSTALLATION 2 2 ELECTRICAL 2 Figure 2 3 REAR TERMINALS ...
Страница 46: ...2 22 PQM Power Quality Meter GE Power Management 2 2 ELECTRICAL 2 INSTALLATION 2 ...
Страница 56: ...3 10 PQM Power Quality Meter GE Power Management 3 4 DEFAULT MESSAGES 3 OPERATION 3 ...
Страница 166: ...6 20 PQM Power Quality Meter GE Power Management 6 6 POWER ANALYSIS 6 SOFTWARE 6 ...
Страница 274: ...B 4 PQM Power Quality Meter GE Power Management B 1 TABLES AND FIGURES APPENDIXB B ...
Страница 276: ...C 2 PQM Power Quality Meter GE Power Management C 1 PQM WARRANTY APPENDIXC C ...
Страница 281: ...GE Power Management PQM Power Quality Meter NOTES ...