GE Power Management
PQM Power Quality Meter
7-59
7 MODBUS COMMUNICATIONS
7.3 MODBUS MEMORY MAP
7
F39
TRACE MEMORY USAGE
FFFF
0 = OFF
---
1 = OPEN-TO-CLOSED
---
2 = CLOSED-TO-OPEN
---
F40
TRACE MEMORY USAGE
FFFF
0 = Ia
---
1 = Ib
---
2 = Ic
---
3 = In
---
4 = Va
---
5 = Vb
---
6 = Vc
---
F41
TRACE MEMORY TRIGGERS
FFFF
0 = Trace Memory Not Triggered
---
1 = Ia Overcurrent
---
2 = Ib Overcurrent
---
3 = Ic Overcurrent
---
4 = In Overcurrent
---
5 = Va Overvoltage
---
6 = Vb Overvoltage
---
7 = Vc Overvoltage
---
8 = Va Undervoltage
---
9 = Vb Undervoltage
---
10 = Vc Undervoltage
---
11 = Switch Input A
---
12 = Switch Input B
---
13 = Switch Input C
---
14 = Switch Input D
---
15 = Serial Communication
---
F43
PULSE INPUT TOTALIZATION
FFFF
0 = 1+2
---
1 = 1+3
---
2 = 1+4
---
3 = 2+3
---
4 = 2+4
---
5 = 3+4
---
6 = 1+2+3
---
7 = 1+3+4
---
8 = 2+3+4
---
9 = 1+2+3+4
---
10 = 1+2+4
---
F44
PHASE CT WIRING
FFFF
0 = Phase A, B and C
---
1 = Phase A and B only
---
2 = Phase A and C only
---
3 = Phase A only
---
Table 7–11: MEMORY MAP DATA FORMATS (Sheet 9 of 16)
CODE
DESCRIPTION
BITMASK
F47
DNP PORT
FFFF
0 = NONE
---
1 = RS232
---
2 = COM1
---
3 = COM2
---
F100
PQM OPTIONS
FFFF
No Options Installed (Chassis Mount)
0000
PQM (Display Version)
0001
T20 (4-20mA Transducer) Option
0002
T1 (0-1mA Transducer) Option
0004
C (Control) Option
0008
A (Power Analysis) Option
0010
Not Used
0020
Not Used
0040
Not Used
0080
Not Used
0100
Not Used
0200
Not Used
0400
Not Used
0800
Not Used
1000
Not Used
2000
Not Used
4000
Not Used
8000
F101
SWITCH INPUT STATUS
(0 = OPEN, 1 = CLOSED)
FFFF
Not Used
0001
Not Used
0002
Not Used
0004
Not Used
0008
Not Used
0010
Not Used
0020
Not Used
0040
Not Used
0080
Switch A
0100
Switch B
0200
Switch C
0400
Switch D
0800
Not Used
1000
Not Used
2000
Not Used
4000
Not Used
8000
Table 7–11: MEMORY MAP DATA FORMATS (Sheet 10 of 16)
CODE
DESCRIPTION
BITMASK
Содержание Power Quality Meter Series
Страница 2: ......
Страница 4: ......
Страница 10: ...vi PQM Power Quality Meter GE Power Management TABLE OF CONTENTS ...
Страница 29: ...GE Power Management PQM Power Quality Meter 2 5 2 INSTALLATION 2 2 ELECTRICAL 2 Figure 2 3 REAR TERMINALS ...
Страница 46: ...2 22 PQM Power Quality Meter GE Power Management 2 2 ELECTRICAL 2 INSTALLATION 2 ...
Страница 56: ...3 10 PQM Power Quality Meter GE Power Management 3 4 DEFAULT MESSAGES 3 OPERATION 3 ...
Страница 166: ...6 20 PQM Power Quality Meter GE Power Management 6 6 POWER ANALYSIS 6 SOFTWARE 6 ...
Страница 274: ...B 4 PQM Power Quality Meter GE Power Management B 1 TABLES AND FIGURES APPENDIXB B ...
Страница 276: ...C 2 PQM Power Quality Meter GE Power Management C 1 PQM WARRANTY APPENDIXC C ...
Страница 281: ...GE Power Management PQM Power Quality Meter NOTES ...