GE Power Management
PQM Power Quality Meter
2-11
2 INSTALLATION
2.2 ELECTRICAL
2
For a single-phase connection, connect current and voltage to the phase A inputs only. All other inputs are
ignored. Select the
S2 SYSTEM SETUP \ CURRENT/VOLTAGE CONFIGURATION \ VT WIRING: SINGLE PHASE
setpoint.
Figure 2–9: SINGLE PHASE CONNECTION
Содержание Power Quality Meter Series
Страница 2: ......
Страница 4: ......
Страница 10: ...vi PQM Power Quality Meter GE Power Management TABLE OF CONTENTS ...
Страница 29: ...GE Power Management PQM Power Quality Meter 2 5 2 INSTALLATION 2 2 ELECTRICAL 2 Figure 2 3 REAR TERMINALS ...
Страница 46: ...2 22 PQM Power Quality Meter GE Power Management 2 2 ELECTRICAL 2 INSTALLATION 2 ...
Страница 56: ...3 10 PQM Power Quality Meter GE Power Management 3 4 DEFAULT MESSAGES 3 OPERATION 3 ...
Страница 166: ...6 20 PQM Power Quality Meter GE Power Management 6 6 POWER ANALYSIS 6 SOFTWARE 6 ...
Страница 274: ...B 4 PQM Power Quality Meter GE Power Management B 1 TABLES AND FIGURES APPENDIXB B ...
Страница 276: ...C 2 PQM Power Quality Meter GE Power Management C 1 PQM WARRANTY APPENDIXC C ...
Страница 281: ...GE Power Management PQM Power Quality Meter NOTES ...