GE Power Management
PQM Power Quality Meter
4-9
4 PROGRAMMING
4.2 S1 PQM SETUP
4
4.2.7 CALCULATION PARAMETERS
The PQM can be programmed to calculate metering quantities and demand by various methods.
Figure 4–7: SETPOINTS PAGE 1 – PQM SETUP / CALCULATION PARAMETERS
•
EXTRACT FUNDAMENTAL: The PQM can be programmed to calculate all metering quantities using true
RMS values or the fundamental component of the sampled data. When this setpoint is set to
DISABLE
, the
PQM will include all harmonic content, up to the 32
nd
harmonic, when making metering calculations. When
this setpoint is set to
ENABLE
, the PQM will extract the fundamental contribution of the sampled data only
and use this contribution to calculate all metering quantities. Many utilities base their metering upon funda-
mental, or displacement, values. Using the fundamental contribution allows one to compare the quantities
measured by the PQM with the local utility meter.
]] SETPOINTS
]] S1 PQM SETUP
] CLOCK
]
EXTRACT FUNDAMENTAL:
DISABLE
CURRENT DEMAND TYPE:
THERMAL EXPONENTIAL
]] SETPOINTS
]] S2 SYSTEM SETUP
SETPOINT
] PREFERENCES
]
] CALCULATION
] PARAMETERS
CURRENT DEMAND TIME
INTERVAL: 30 min
POWER DEMAND TYPE:
THERMAL EXPONENTIAL
POWER DEMAND TIME
INTERVAL: 30 min
ENERGY COST PER kWh:
10.00 cents
Range: ENABLE, DISABLE
Range: THERMAL EXPONENTIAL, ROLLING
INTERVAL, BLOCK INTERVAL
Range: 5 to 180 min.; Step: 1 min.
Range: 0.01 to 500.00 cents
Step: 0.01 cents
Range: THERMAL EXPONENTIAL, ROLLING
INTERVAL, BLOCK INTERVAL
Range: 0 to 180 min.; Step: 1 min.
TARIFF PERIOD 1
START TIME: 0 min.
TARIFF PERIOD 1 COST
PER MWH: 10.00 cents
TARIFF PERIOD 2
START TIME: 0 min.
TARIFF PERIOD 2 COST
PER MWH: 10.00 cents
TARIFF PERIOD 3
START TIME: 0 min.
TARIFF PERIOD 3 COST
PER MWH: 10.00 cents
Range: 0 to 1439 min.; Step: 1 min.
Range: 0 to 1439 min.; Step: 1 min.
Range: 0 to 1439 min.
Step: 1 min.
Range: 0.01 to 500.00 cents
Step: 0.01 cents
Range: 0.01 to 500.00 cents
Step: 0.01 cents
Range: 0.01 to 500.00 cents
Step: 0.01 cents
M E S S A G E
M E S S A G E
M E S S A G E
Содержание Power Quality Meter Series
Страница 2: ......
Страница 4: ......
Страница 10: ...vi PQM Power Quality Meter GE Power Management TABLE OF CONTENTS ...
Страница 29: ...GE Power Management PQM Power Quality Meter 2 5 2 INSTALLATION 2 2 ELECTRICAL 2 Figure 2 3 REAR TERMINALS ...
Страница 46: ...2 22 PQM Power Quality Meter GE Power Management 2 2 ELECTRICAL 2 INSTALLATION 2 ...
Страница 56: ...3 10 PQM Power Quality Meter GE Power Management 3 4 DEFAULT MESSAGES 3 OPERATION 3 ...
Страница 166: ...6 20 PQM Power Quality Meter GE Power Management 6 6 POWER ANALYSIS 6 SOFTWARE 6 ...
Страница 274: ...B 4 PQM Power Quality Meter GE Power Management B 1 TABLES AND FIGURES APPENDIXB B ...
Страница 276: ...C 2 PQM Power Quality Meter GE Power Management C 1 PQM WARRANTY APPENDIXC C ...
Страница 281: ...GE Power Management PQM Power Quality Meter NOTES ...