![GE Power Quality Meter Series Скачать руководство пользователя страница 110](http://html.mh-extra.com/html/ge/power-quality-meter-series/power-quality-meter-series_instruction-manual_128426110.webp)
4-54
PQM Power Quality Meter
GE Power Management
4.6 S5 TESTING
4 PROGRAMMING
4
4.6 S5 TESTING
4.6.1 TEST OUTPUT RELAYS & LEDS
Figure 4–34: SETPOINTS PAGE 5 – TESTING
•
OPERATION TEST: To verify correct operation of output relay wiring, each output relay and status indica-
tor can be manually forced on or off via the keypad or serial port.
While the
OPERATION TEST
setpoint is displayed, use the
or
keys to scroll to the
desired output relay and/or status indicator to be tested. As long as the test message remains displayed
the respective output relay and/or status indicator will be forced to remain energized. As soon as a new
message is selected, the respective output relay and/or status indicator return to normal operation.
]] SETPOINTS
]] S5 TESTING
] TEST RELAYS & LEDS
]
OPERATION TEST:
NORMAL MODE
]] SETPOINTS
]] S1 PQM SETUP
SETPOINT
M E S S A G E
M E S S A G E
M E S S A G E
V A L U E
V A L U E
Содержание Power Quality Meter Series
Страница 2: ......
Страница 4: ......
Страница 10: ...vi PQM Power Quality Meter GE Power Management TABLE OF CONTENTS ...
Страница 29: ...GE Power Management PQM Power Quality Meter 2 5 2 INSTALLATION 2 2 ELECTRICAL 2 Figure 2 3 REAR TERMINALS ...
Страница 46: ...2 22 PQM Power Quality Meter GE Power Management 2 2 ELECTRICAL 2 INSTALLATION 2 ...
Страница 56: ...3 10 PQM Power Quality Meter GE Power Management 3 4 DEFAULT MESSAGES 3 OPERATION 3 ...
Страница 166: ...6 20 PQM Power Quality Meter GE Power Management 6 6 POWER ANALYSIS 6 SOFTWARE 6 ...
Страница 274: ...B 4 PQM Power Quality Meter GE Power Management B 1 TABLES AND FIGURES APPENDIXB B ...
Страница 276: ...C 2 PQM Power Quality Meter GE Power Management C 1 PQM WARRANTY APPENDIXC C ...
Страница 281: ...GE Power Management PQM Power Quality Meter NOTES ...