GE H
EALTHCARE
D
IRECTION
5213326-100, R
EVISION
3
LOGIQ™ A3 S
ERVICE
M
ANUAL
10-8
Section 10-5 - System Maintenance
10-5-2
Functional Checks (See Also Chapter 4)
The functional checks take about 60 minutes to perform. Refer to the system user documentation
whenever necessary.
10-5-2-1
System Checks
NOTE:
* Some software may be considered standard depending upon system model configuration.
10-5-2-2
Peripheral/Option Checks
If any peripherals or options are not part of the system configuration, the check can be omitted. Refer
to the User Manual for a list of approved peripherals/options.
10-5-3
Input Power
10-5-3-1
Mains Cable Inspection
Table 10-7 System Functional Checks
÷
Step
Description
B-Mode
Verify basic B-Mode (2D) operation. Check the basic system controls that affect this mode of
operation.
M-Mode
Verify basic M-Mode operation. Check the basic system controls that affect this mode of operation.
Probe Elements
Perform an Element Test, on each probe to verify that all probe elements (and system channels) are
functional.
Control Panel Test
Perform the Control Panel Test Procedure, to verify that all keyboard controls are OK. This is
performed by the internal PC (backend processor) which does a normal keyboard run through.
Monitor
Verify basic Monitor display functions.
Table 10-8 GE Approved Peripheral/Hardware Option Functional Checks
Step
Item
Description
2
B/W Printer
Verify hardcopy output of the B/W video page printer. Clean heads and covers if necessary.
4
Footswitch
Verify that the footswitch is functioning as programed. Clean as necessary.
Table 10-9 Mains Cable Inspection
Step
Item
Description
1
Unplug Cord Disconnect the mains cable from the wall and system.
2
Inspect
Inspect it and its connectors for damage of any kind.
3
Verify
Verify that the LINE, NEUTRAL and GROUND wires are properly attached to the terminals, and that no
strands may cause a short circuit.
4
Verify
Inlet connector retainer is functional.
State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.
See the GEHC Myworkshop System to determine the status of this document.
Approved Document - 5213326-100TPH_r3.pdf Page 231 of 252