GE H
EALTHCARE
D
IRECTION
5213326-100, R
EVISION
3
LOGIQ™ A3 S
ERVICE
M
ANUAL
8-30
Section 8-4 - Mechanicals
8-4-5
Top Cover (FRU P/N # 5168637)
8-4-5-1
Tools
•
Common phillips screwdrivers
8-4-5-2
Needed Manpower
•
1person, 15 m travel
8-4-5-3
Preparations
•
Shutdown the system and switch off the main Circuit Breaker at the bottom rear side of the system.
8-4-5-4
Removal Procedure
1. Remove the front cover
2. Remove the Rear Arm cover set
3. Remove the Top cover by unfastening the 2 screws (marked in Figure 8-24) holding it
Figure 8-24 Top Cover
8-4-5-5
Functional Checkout Procedure
See Section
Functional and/or
Leakage Current
Test
Debrief Script
Service Manual Direction 5213326-100, Rev 3, Section 8-4-5. Equipment passes all
required tests and is ready for use.
Basic Controls
B- Mode Checks
M-Mode Checks
Top Cover
State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.
See the GEHC Myworkshop System to determine the status of this document.
Approved Document - 5213326-100TPH_r3.pdf Page 179 of 252