GE H
EALTHCARE
D
IRECTION
5213326-100, R
EVISION
3
LOGIQ™ A3 S
ERVICE
M
ANUAL
Index
Index - 1
Index
B
Basic Measurements
Boot Up 14
C
Cine
Cooling 2
Customer Assistance 18
E
Electrical Safety 8
EMI Limitations 4
EMI Protection 11
Environmental Conditions
F
Functional Checks
Basic Measurements 9
Image Management 11
Probes/Connector Usage 10
Using Cine 11
G
General Cleaning 9
H
Hazard Icons 4
Human Safety 7
I
Image Management
Installation 1
L
Lighting 2
M
Manpower Requirements 5
Mechanical Safety 7
Minimal Floor Plan Suggestion 8
P
Power Off 16
Power On 14
Power-up Procedures
Prepearing the Unit for Installation 11
Probe Connector Cleaning 11
Probes/Connector Usage
Purchaser Responsibilities 6
R
Receiving and Unpacking the Equipment 3
Regulatory 1
S
Safety Considerations 7
Service Adjustments 1
Shutdown 16
System Maintenance 7
T
Time and Manpower Requirements 5
U
Unpacking the Equipment 3
V
Voltage Settings 11
W
Warnings and Cautions 7
State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.
See the GEHC Myworkshop System to determine the status of this document.
Approved Document - 5213326-100TPH_r3.pdf Page 250 of 252