GE H
EALTHCARE
D
IRECTION
5213326-100, R
EVISION
3
LOGIQ™ A3 S
ERVICE
M
ANUAL
Chapter 3
3-7
Section 3-2 Receiving and Unpacking LOGIQ A3
4.) Move the slide plywoods to make space for placing the ramp.
5.) Remove the internal foams carefully.
6.) Place the top cover as shown in the figure 3-4 below to form the ramp to put the console down.
Figure 3-4 Position Top Cover
State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.
See the GEHC Myworkshop System to determine the status of this document.
Approved Document - 5213326-100TPH_r3.pdf Page 64 of 252