GE H
EALTHCARE
D
IRECTION
5213326-100, R
EVISION
3
LOGIQ™ A3 S
ERVICE
M
ANUAL
Chapter 3
3-1
Chapter 3Installation
Section 3-1Overview
3-1-1
Purpose
This chapter contains information needed to install the unit. Included are references to a procedure that
describes how to receive and unpack the equipment and how to file a damage or loss claim
3-1-2
Table Of Contents
Table 3-1
Contents in Chapter 3
S.No
Description
Page Number
1.
2.
Receiving and Unpacking LOGIQ A3
3.
4.
5.
6.
Product Locator Installation Card
7.
8.
9.
10.
11.
12.
Connectivity Installation Worksheet
3-29
13.
Paper work
3-37
State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.
See the GEHC Myworkshop System to determine the status of this document.
Approved Document - 5213326-100TPH_r3.pdf Page 58 of 252