GE H
EALTHCARE
D
IRECTION
5213326-100, R
EVISION
3
LOGIQ™ A3 S
ERVICE
M
ANUAL
10-10
Section 10-5 - System Maintenance
10-5-4-3
Physical Inspection
Table 10-12 Physical Checks
Step
Item
Description
1
Labeling
Verify that all system labeling is present and in readable condition.
2
Scratches & Dents Inspect the console for dents, scratches or cracks.
3
Control Panel
Inspect keyboard and control panel. Note any damaged or missing items.
4
Control Panel
Movement
Verify ease of control panel (Operator I/O Panel) movement in all acceptable directions. Ensure that
it latches in position as required.
5
Wheels & Brakes
Check all wheels and casters for wear and verify operation of foot brake, to stop the unit from moving,
and release mechanism. Check all wheel locks and wheel swivel locks for proper operation.
6
Cables &
Connectors
Check all internal cable harnesses and connectors for wear and secure connector seating. Pay
special attention to footswitch assembly and probe strain or bend reliefs.
7
Shielding &
Covers
Check to ensure that all EMI shielding, internal covers, air flow panels and screws are in place.
Missing covers and hardware could cause EMI/RFI problems while scanning.
8
External I/O
Check all connectors for damage and verify that the labeling is good.
State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.
See the GEHC Myworkshop System to determine the status of this document.
Approved Document - 5213326-100TPH_r3.pdf Page 233 of 252