GE H
EALTHCARE
D
IRECTION
5213326-100, R
EVISION
3
LOGIQ™ A3 S
ERVICE
M
ANUAL
Chapter 2
2-5
2-2-5
Probes Environmental Requirements
NOTE:
Temperature in degrees C. Conversion to Degrees F = (Degrees C * 9/5) + 32).
2-2-6
Time and Manpower Requirements
Site preparation takes time. Begin Pre-installation checks as soon as possible. If possible, allow six
weeks before delivery, for enough time to make necessary changes.
Do not place labels where
RF gaskets touch metal
Never place a label where RF gaskets meet the unit. Otherwise, the gap created will permit RF
leakage. Or, if a label has been found in such a position, move the label.
Use GE specified harnesses
and peripherals
The interconnect cables are grounded and require ferrite beads and other shielding. Also, cable
length, material, and routing are all important; do not change from what is specified.
Take care with cellular
phones
Cellular phones may transmit a 5 V/m signal; that could cause image artifacts.
Properly dress peripheral
cables
Do not allow cables to lie across the top of the card cage or hang out of the peripheral bays. Loop
the excess length for peripheral cables inside the peripheral bays. Attach the monitor cables to the
frame.
ELECTRONIC
Operation:
10 to 40 degree C(50 to 104 degree F)
Storage:
-20 to 50 degree C(-4 to 122 degree F)
Temperatures in degree C, conversion to degree F = degree C*(9/5) + 32)
Table 2-6
Operation and storage Temperatures for Probes
NOTICE
SYSTEMS AND ELECTRONIC PROBES ARE DESIGNED FOR STORAGE TEMPERATURES
OF -20 TO + 50(-4 to 122 degree F) degrees C. WHEN EXPOSED TO LARGE TEMPERATURE
VARIATIONS, THE PRODUCT SHOULD BE KEPT IN ROOM TEMPERATURE FOR 10 HOURS
BEFORE USE.
CAUTION
Have two people available to deliver and unpack the LOGIQ A3.
Attempts to move the unit considerable distances or on an incline by one person could result
in injury or damage or both.
EMI Rule
Details
Table 2-5
EMI Prevention/Abatement
State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.
See the GEHC Myworkshop System to determine the status of this document.
Approved Document - 5213326-100TPH_r3.pdf Page 54 of 252