GE H
EALTHCARE
D
IRECTION
5213326-100, R
EVISION
3
LOGIQ™ A3 S
ERVICE
M
ANUAL
Chapter 8
8-65
5.) Remove the Transformer Assembly from the guide
8-7-1-5
Functional Checkout Procedure
See Section
Functional and/or
Leakage Current
Test
Debrief Script
Service Manual Direction 5213326-100, Rev 3, Section 8-7-1.
Leakage Current mea-
sured at ________ [record value] and meets allowable limits.
Equipment passes
all required tests and is ready for use.
Basic Controls
B- Mode Checks
M-Mode Checks
Measurement Check
S/W Config Checks
Peripheral Checks
Probe/Connector
Check
Service Diagnostics
Chassis Leakage
Current
State: RELEASE - Document is released and under formal Change Control. Changes are subject to the ECR/ECO Process.
See the GEHC Myworkshop System to determine the status of this document.
Approved Document - 5213326-100TPH_r3.pdf Page 214 of 252