100/180 mm PAPERLESS GRAPHIC RECORDER: USER GUIDE
HA028910
Issue 13 Sep 16
User Guide
Page 106
4.3.10 BATCH INITIATION (Cont.)
Figure 4.3.10c Status page (Batch running)
Batch - Group 1
Stop Close
New
Batch in progress
Status
Batch Number: 050822.001
Customer Name: FishesRus
Operator Name: Marvin
Supervisor: Fred
BATCH MESSAGE DISPLAY
The messages are displayed on the Graph Trend display as shown in fi gure 4.3.10d, below. This fi gure
uses the example given in the previous sections, and uses only four messages. Further messages would
appear above message 4. The fi gure also shows that time and date are added to the messages, and that
the currently running batch number is given in the Group name area. Touching this area calls the Batch
status page. In this job-triggered batch, the alarm triggering the job also appears (as shown).
Channel 1
400.00
800.00
700.87
Group 1
Batch Number 050822.001
12:14:17
22/08/05
12:13:46
22/08/05
12:11:06
22/08/05
12:08:26
22/08/05
Engineer
720.00
640.00
22/08/05 12:14:31 Alarm(s) on 3(1)
22/08/05 12:14:31 Supervisor: Fred
22/08/05 12:14:31 Operator Name: Marvin
22/08/05 12:14:31 Customer name: FishesRus
22/08/05 12:14:31 Batch number: 050822.001
22/08/05 12:14:31 Config Revision:48 Security Revision 1
22/08/05 12:14:31 Batch start (Automatic)
Operator entries
Batch start message
480.00
560.00
Touching this area calls the
batch status page
Date and time automatically printed
Batch trigger source
Figure 4.3.10d Typical Batch start messages