3 Installation
TopClean S CPC 30
14
EHauser
Connections on the base of the CPG 30
3.4
Post-installation check
After installing the control unit, transmitter and assembly, carry out the following checks:
Compressed air
connections
Connection
Use
I
Compressed air supply
II
n/a for non-Ex
III
n/a for non-Ex
Additional valves
Electrically controlled with non-Ex (switched power
supply; for connection, see electrical connection
diagrams)
Fig. 9:
Pneumatics and hydraulics plan for CPG 30 non-Ex
II
III
II
III
MS 1
compressed
air
process
assembly
bottom
view
instrument front
instrument back
multi hose
MS
10
I
C07-CPC30xxx-04-12-00-en-006.EPS
Installation
Remarks
Are the measuring point number and the labelling correct?
Visual inspection
Process environment/conditions
Remarks
Is the transmitter protected against rainfall and direct
sunlight?
For outdoor use, the CYY 101 weather
protection cover is required
(see "Accessories").
Is the control unit protected against rainfall and direct
sunlight?
Avoid direct sunlight.
Is the multihose placed sheltered?
Use protection pipe if necessary.
Содержание TopClean S CPC 30
Страница 127: ...TopClean S CPC 30 11 Appendix Endress Hauser 127...
Страница 138: ...11 Appendix TopClean S CPC 30 138 Endress Hauser...
Страница 144: ...12 Index TopClean S CPC 30 144 Endress Hauser...