SiAUY361411EA
Test Run Manual
Device Overview
72
0FGHP-EN0841 DGJ002
–
5
–
2 How to Perform a Test Run
Main circuit board diagram
EV1 CN13 EV4 CN16
EV5 CN17
EV2 CN14
EV6 CN18
EV3 CN15
CN8
CN20
CN10
CN9
CN1
CN12
CN11
CN23
CN7
CN22
CN3
CN4
CN5
CN2
CN6
LED1
LED2
LED3
CN19
CN21
CN24
F1
250V 500mA
F2
125V 10A
SW12
LED4
H moniter
Main CPU
Writing
Normal
LED5
RY3
IC7
RUN
運転
STOP
停止
SW2
SW1
Checker
チェッカー
Wiring change
配線換
SW7
SW6
BACK
SW4
UP
SW3
NEXT
ENTER
DOWN
SW5
DSW1
DSW2
DSW3
DSW4
DSW5
IC1
Note: The number of connectors, etc. will vary slightly depending on the model.
022670-00E
Configuring the switches on the BS unit
z
You have to configure these switches when you use a heating/cooling switching remote controller or
centralized cooling/heating remote controller.
z
Be sure to configure the switches before turning on the power. The settings are read by the
microcomputer when the device is turned on.
z
For more information on the settings, refer to the BS unit work instruction manual.
Wiring Change
After you finish wiring work and outdoor unit configuration work, perform "Wiring
change" by pressing and holding down SW2 on the main PCB for at least 5 seconds
with the power turned on prior to test run. Without "Wiring change," establishing
the communication may fail.
Содержание GYEQ20AN
Страница 1: ...Heat Recovery R 410A 50 Hz GYEQ20 30AN SiAUY361411EA Service Manual Gas Heat Pump Air Conditioner...
Страница 21: ...SiAUY361411EA External Diagrams Device Overview 10 3 External Diagrams GYEQ20AN 3PA003981A Unit mm...
Страница 22: ...External Diagrams SiAUY361411EA 11 Device Overview GYEQ30AN 3PA003980A Unit mm...
Страница 58: ...Installation Work Manual SiAUY361411EA 47 Device Overview 0FGHP EN0801 DGJ002...
Страница 60: ...Installation Work Manual SiAUY361411EA 49 Device Overview 0FGHP EN0801 DGJ002...
Страница 225: ...SiAUY361411EA Maintenance Maintenance Service Data 214...