3. Setting and Rewiring the Outdoor Unit
Checklist for the Completion of Work
z
Confirm the following contents after the completion of work and adjust if required.
Check
Item to confirm
The electrical wiring uses a dedicated branch circuit that is not shared with other electric equipment.
(The electrical wiring is an dedicated branch circuit.)
An earth leakage circuit breaker, isolating switch (with fuse), or wiring circuit breaker with the appropriate
capacity is used.
Use specified cables (wire type/thickness) for electrical work. The cables should be perfectly connected to the
appropriate connectors and fastened tightly so that the connecting terminals will not be exposed to external
forces via the cables.
The thickness of wiring is equal to, or greater than, the prescribed size.
The power supply and voltage are the same as the specification shown on the units (identification plates).
The earth wire is not connected to the earth wire of a telephone, gas pipe, water pipe or conductor rod.
The earthing work has been done.
Содержание GYEQ20AN
Страница 1: ...Heat Recovery R 410A 50 Hz GYEQ20 30AN SiAUY361411EA Service Manual Gas Heat Pump Air Conditioner...
Страница 21: ...SiAUY361411EA External Diagrams Device Overview 10 3 External Diagrams GYEQ20AN 3PA003981A Unit mm...
Страница 22: ...External Diagrams SiAUY361411EA 11 Device Overview GYEQ30AN 3PA003980A Unit mm...
Страница 58: ...Installation Work Manual SiAUY361411EA 47 Device Overview 0FGHP EN0801 DGJ002...
Страница 60: ...Installation Work Manual SiAUY361411EA 49 Device Overview 0FGHP EN0801 DGJ002...
Страница 225: ...SiAUY361411EA Maintenance Maintenance Service Data 214...