SiAUY361411EA
Inspecting the Outdoor Unit
Parts Inspection
196
1.30 Checking Stop Valve Operation
Check if the stop valve turns in the correct direction when opened/closed.
There is a stop valve inside the outdoor unit.
GYEQ20AN
GYEQ30AN
Flange
(packed together)
Local pipe
Local pipe
Packing
(packed together)
The handle is fully closed when
shipped from the factory, during pipe
connection work, vacuuming and
charging with additional refrigerant.
The valve stem turns up to 90 degree.
Use to evacuate the local refrigerant
pipe and additional charging with
refrigerant. Open and close with a
double-spanner. Be sure to fit the cap
again after completing the operation.
(Cap tightening torque: 11.8 - 14.7N•m)
Valve stem
Stopper pin
Service port
[Fluid side]
[Suction gas side]
Service port
Cap, copper packing
Flange
(packed together)
Remove the cap to operate
the valve stem. Be sure to fit
again after completing the
operation.
Use to evacuate the local
refrigerant piping and additional
charging with refrigerant. Open and
close with a double-spanner. Be
sure to fit the cap again after
completing the operation.
Securely fit the packing (packed
together) into the flange of the valve
to prevent gas leaks. Apply
refrigerating machine oil to both end
faces of the packing.
[Discharge gas side]
026746-03EN00
Flare nut tightening torque
M6 hexagon socket head cap screw
11±1
Unit: N•m
Flange
(packed together)
Local pipe
Local pipe
Packing
(packed together)
The handle is fully closed when
shipped from the factory, during pipe
connection work, vacuuming and
charging with additional refrigerant.
The valve stem turns up to 90 degree.
Use to evacuate the local refrigerant
pipe and additional charging with
refrigerant. Open and close with a
double-spanner. Be sure to fit the cap
again after completing the operation.
(Cap tightening torque: 11.8 - 14.7N•m)
Valve stem
Stopper pin
Service port
[Fluid side]
[Suction gas side]
Service port
Cap, copper packing
Flange
(packed together)
Remove the cap to operate
the valve stem. Be sure to fit
again after completing the
operation.
Use to evacuate the local
refrigerant piping and additional
charging with refrigerant. Open and
close with a double-spanner. Be
sure to fit the cap again after
completing the operation.
Securely fit the packing (packed
together) into the flange of the valve
to prevent gas leaks. Apply
refrigerating machine oil to both end
faces of the packing.
[Discharge gas side]
Flare nut tightening torque
M6 hexagon socket head cap screw
11±1
Unit: N•m
026747-02EN00
Содержание GYEQ20AN
Страница 1: ...Heat Recovery R 410A 50 Hz GYEQ20 30AN SiAUY361411EA Service Manual Gas Heat Pump Air Conditioner...
Страница 21: ...SiAUY361411EA External Diagrams Device Overview 10 3 External Diagrams GYEQ20AN 3PA003981A Unit mm...
Страница 22: ...External Diagrams SiAUY361411EA 11 Device Overview GYEQ30AN 3PA003980A Unit mm...
Страница 58: ...Installation Work Manual SiAUY361411EA 47 Device Overview 0FGHP EN0801 DGJ002...
Страница 60: ...Installation Work Manual SiAUY361411EA 49 Device Overview 0FGHP EN0801 DGJ002...
Страница 225: ...SiAUY361411EA Maintenance Maintenance Service Data 214...