
4-17
Chapter 4. Functions
z
z
END
→
READY
(1) Press the
[
]
(mode) button on the 1-loop monitor screen.
> The mode selection screen appears.
(2) Press the
[RUN]
button to the right of "RUN/READY."
> The confirmation screen for changing the mode to READY appears.
(3) Press the
[READY]
button.
> The mode changes to READY.
Handling Precautions
•
The END mode is sometimes called the RUN-END mode because PID control is
in the RUN state (control is active).
•
The END mode cannot be switched to the RUN mode or HOLD mode.
•
Although there is no operation for switching the RUN mode or HOLD mode
to the END mode, the mode switches to the END mode when the "End of
operation" setting is set to END and the pattern is processed to the end by
ADVANCE.
z
ADVANCE
In the pattern operation mode, the operation can progress to the next segment for
each control loop.
(1) Press the
[
]
(mode) button on the 1-loop monitor screen.
> The mode selection screen appears.
(2) Press the
[PATTERN]
button in the upper left corner of the screen.
> The mode selection screen for pattern operation appears.
(3) Press the
[ADVANCE]
button to the right of ADVANCE.
> The ADVANCE execution confirmation screen appears.
(4) Press the
[ADVANCE]
button.
> The operation advances to the beginning of the next segment.
Handling Precautions
•
ADVANCE is only available in the RUN and HOLD modes. It is not available in
the READY and END modes.
•
If ADVANCE is executed in the G.SOAK wait state, the G.SOAK wait period for
the segment is canceled and the operation advances to the beginning of the
next segment.
•
If ADVANCE is executed in the last segment of a pattern, cycles are executed if
there are cycles remaining, and the pattern link is executed if a pattern link is
set. If there are no cycles or pattern links, the controller enters READY mode,
END mode, or constant value operation, according to the setting of "End of
operation."
•
ADVANCE cannot be executed when the pattern SP increase change limit
is something other than 0.0000 or the pattern SP decrease change limit is
something other than 0.0000.