
2-2
Chapter 2. Mounting
2 - 2
Mounting Method
z
Standard mounting
z
z
Main unit
Mount the main unit on a DIN rail with a width of 35 mm. Check that the DIN rail
holding tab on the main unit is pushed in. Hook the catches on the upper back of
the main unit onto the DIN rail and press the main unit until it clicks into place.
z
z
Display unit and additional display unit
To mount the display unit, follow the steps below.
After mounting the main unit and display unit, connect them using a Cat5E or
higher straight LAN cable
*
of an appropriate length.
*Cable is not included with the product.
Note
•
Connecting the cable between the main unit and display unit (p. 3-18)
(for details about the cable to be used)
(1) Screw the setscrews for temporary mounting into the two screw holes in the
upper part of the back of the display unit, turning them approximately three
full turns by hand.
Handling Precautions
•
Excessive tightening may cause damage to the protective sheet.
Turn three full turns
Setscrew
Standard gasket
(2) Mount the display unit temporarily on the front of the panel. Align the the
wiring hole with the connector and insert the setscrews into the mounting
screw holes.
Wiring hole
Mounting screw hole