24 Startup, control with I/O and ID run
3 – Diagnostics menu
After making the additional adjustments and
checking the I/O connections, use the
Diagnostics
menu to make sure that the
setup is functioning correctly.
In the
Main
menu, select
Diagnostics
and
press
(
Select
) (or
).
Select the diagnostics item you want to view
and press
(
Select
).
Return to the
Diagnostics
menu by pressing
(
Back
).
4 – Back up
After you have finished startup ABB
recommends that you make a backup.
In the
Main
menu, select
Backups
and press
(
Select
) (or
).
Press
(
Select
) to start backup.
Содержание ACQ80
Страница 1: ... ABB DRIVES FOR WATER ACQ80 standard program control Firmware manual ...
Страница 2: ... Related documents are listed on page 13 ...
Страница 4: ......
Страница 10: ...10 Table of contents ...
Страница 32: ...32 Startup control with I O and ID run ...
Страница 34: ...34 Using the control panel ...
Страница 74: ...74 Program features ...
Страница 78: ...78 Control macros ...
Страница 380: ...380 Fieldbus control through a fieldbus adapter ...
Страница 384: ...384 Parameterization with Drive Composer ...
Страница 388: ...388 Parameterization with Automation builder drive manager ...