CABLE ROUTING
2-22
1. Horn connector
2. Coolant reservoir hose
3. Windshield inner panel (left)
4. Front turn signal light coupler (left)
5. Fog light coupler
6. Auxiliary DC jack coupler (left)
7. Auxiliary DC jack lead
8. Wire harness
9. Main switch
10. Handlebar switch lead (right)
11. Brake hose (front brake master cylinder to
hydraulic unit)
12. Throttle cables
13. Clutch cable
14. Handlebar switch lead (left)
15. Ignition coil #2 coupler
16. Ignition coil #1 coupler
17. Intake air pressure sensor coupler
18. Intake air pressure sensor hose
19. Sidestand switch lead
20. Stator coil lead
21. Down tube
22. Coolant reservoir breather hose
23. Wire harness (to horn)
24. Wire harness (to front left turn signal light/auxiliary
DC jack/fog light)
25. Stator coil coupler (gray)
26. Rectifier/regulator coupler (black)
27. Radiator inlet hose
28. O
2
sensor coupler
29. Oil pressure switch lead
30. Wire harness (to headlight/front left turn signal
light/grip warmer)
31. Radiator fan motor lead
32. Front wheel sensor lead
33. Rectifier/regulator lead
34. Wire harness (to hydraulic unit)
35. Frame
A. To Auxiliary DC jack
B. Route the wire harness through the guide on the
left windshield inner panel.
C. Route the auxiliary DC jack lead through the lower
hole in the left windshield inner panel.
D. Fasten the fog light coupler and auxiliary DC jack
lead with the plastic locking tie. Face the buckle of
the plastic locking tie upward with the end pointing
upward. Cut off the excess end of the plastic
locking tie to 5 mm (0.20 in) or less.
E. Upward
F. Downward
G. Inward
H. Outward
I.
Insert the projection on the wire harness holder
into the hole in the headlight inner cover.
J. Right side
K. Left side
L. Forward
M. Rearward
N. To hydraulic unit
O. Install the intake air pressure sensor hose until it
bottoms out the intake air pressure sensor.
P. Engage the clamp by at least three notches.
Q. Insert the projection on the radiator fan motor
coupler into the hole in the coupler holder.
R. Insert the projection on the front wheel sensor
coupler into the hole in the coupler holder.
S. Insert the projection on the wire harness holder
into the hole in the frame.
T. Route the wire harness between the frame and the
left handlebar switch lead.
U. Insert the projection on the holder into the hole in
the frame.
Summary of Contents for Tenere 700 2020
Page 1: ...2020 SERVICE MANUAL T n r 700 XTZ690 XTZ690 U BW3 F8197 E0...
Page 2: ......
Page 6: ......
Page 8: ......
Page 56: ...CABLE ROUTING 2 33 Hydraulic unit assembly top and left side view 1 2 3 4 3 4...
Page 58: ...CABLE ROUTING 2 35 Radiator front and right side view A B C 1 2 3 3 4 5...
Page 60: ...CABLE ROUTING 2 37 Radiator left side view A B C D D F E G 1 1 2 2 3 4 5 6 6 7 5...
Page 62: ...CABLE ROUTING 2 39...
Page 65: ......
Page 213: ...CYLINDER HEAD 5 26...
Page 252: ...CRANKCASE 5 65 a 1 2 2 b 45 10 1...
Page 292: ...WATER PUMP 6 15...
Page 308: ...THROTTLE BODIES 7 15...
Page 311: ......
Page 317: ...IGNITION SYSTEM 8 6...
Page 325: ...CHARGING SYSTEM 8 14...
Page 329: ...LIGHTING SYSTEM 8 18...
Page 337: ...SIGNALING SYSTEM 8 26...
Page 393: ...FUEL INJECTION SYSTEM 8 82...
Page 407: ...IMMOBILIZER SYSTEM 8 96...
Page 452: ...ELECTRICAL COMPONENTS 8 141...
Page 469: ......
Page 470: ......