Appendix B: Performance Verification
BĆ2
DG2030 User Manual
Before Running the Operation Tests
Perform the following before running the Operation Tests.
A 20 minute warm up period is required prior to running the operation tests.
The clock calibration must be performed after the warm up period has been
passed. The calibration must be made during operations at least when the
ambient temperature has been changed by
±
5
_
C from previous calibration.
To perform the clock calibration:
1. Select UTILITY
!
Cal
!
Execute.
2. Verify whether error have occurred or not in the screen.
The performance check disk provided with the DG2030 includes the files listed
in Table B-1. The specified file must be loaded into the DG2030 for each
operation test item. These files include pattern data and setup information.
Table BĆ1: Performance check disk's file list
File name
Operation test
TP1CLK.PDA
Internal clock frequency
TP2EXCLK.PDA
External clock input
TP3PG.PDA
Sequence and digital output
TP5EV52.PDA
Event input
TP6INH.PDA
Inhibit function
TP7LVL.PDA
Data output voltage level
TP8PULSE.PDA
Clock output amplitude and delay time
TP9ABBE.PDA
Aberration
Use the following procedure to load the file required by a performance test into
the instrument.
1. Insert the performance check disk into the DG2030’s floppy disk drive.
2. Select EDIT
!
File
!
Load Data & Setup.
3. Select the required file using the general purpose knob.
4. Select OK from the sub menu.
Warm up
Calibration
File Loading
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com