Getting Started
DG2030 User Manual
1Ć9
Standby Power
6. Push the PRINCIPAL POWER SWITCH (shown in Figure 1-1) on the
rear panel of the instrument. Power is now applied to the standby circuit of
the instrument. Once the instrument is installed, leave the PRINCIPAL
POWER SWITCH on and use the ON/STBY switch as the power switch.
Fuse
PRINCIPAL POWER
SWITCH
Power Connector
Figure 1Ć1: Rear panel power switch, fuse holder, and connector.
Power On
7. Press the ON/STBY switch (shown in Figure 1-2) on the lower left side of
the front panel to switch on the power for the instrument.
NOTE
. the instrument needs to be warmed up for at least 20 minutes and then be
calibrated for the clock in order to operate at its optimum precision.
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com