Commissioning
Commissioning Test Data Sheet
110
SSU-2000 User’s Guide
12713020-002-2 Revision D – April 2004
Testing the System Stability and Accuracy (Optional)
This test is only to be performed if a PRS (primary reference source) and the
necessary test equipment is available. If the above tests have been passed, the
system output will meet the stability and accuracy of the reference input.
1. Connect one of the system outputs and the PRS signal to the test equipment to
monitor the stability and accuracy. This test should be allowed to run for 24 hours
to collect sufficient data to verify the system output meets specifications.
2. Process the collected 24 hour data and verify that the frequency and stability
(MTIE and TDEV) meet the specifications.
This completes the commissioning tests. The system is ready to be placed in
service.
Commissioning Test Data Sheet
The following test data sheet should be completed as an indicator of operational
readiness of the SSU-2000.
Table 4-2. Commissioning Test Data Sheet
Test
Pass
Fail
Ethernet communications
EIA-232 Port A communications
EIA-232 Port B communications
EIA-232 Port C communications (on front of
Communications module)
MINOR Alarms
MAJOR Alarms
CRITICAL Alarms
Reference Signals and Selection
Clock Section
Output Section
System Stability and Accuracy (optional)
Summary of Contents for SDU-2000
Page 12: ...12 SSU 2000 User s Guide 12713020 002 2 Revision D April 2004 ...
Page 18: ...18 SSU 2000 User s Guide 12713020 002 2 Revision D April 2004 ...
Page 390: ...SNMP Protocol 390 SSU 2000 User s Guide 12713020 002 2 Revision D April 2004 ...
Page 420: ...I O Connector Grounding 420 SSU 2000 User s Guide 12713020 002 2 Revision D April 2004 ...