The following paragraphs contain the SSU-2000 commissioning test procedures.
These procedures consist of the following tests:
Testing the Ethernet Communications Interface
Testing the RS-232 Ports
Testing the SSU-2000 Minor alarms
Testing the SSU-2000 Major alarms
Testing the SSU-2000 Critical alarms
Testing the Reference Input Signals
Testing the SSU-2000 Output signals
Testing the Ethernet Communications Interface
If an Ethernet connection to a network has been installed, use the following
procedure to test the connection.
1. Telnet from the PC to the IP address assigned to the SSU-2000. The system
prompts for a user name.
2. Type your assigned
username and password and press
Enter.
The system
prompt appears.
3. Type
bye
and press
Enter
to log off the system.
Testing the EIA-232 Ports
To test the EIA-232 port A:
1. Connect the PC or terminal to EIA-232 Port A as described in
2. Type
HELP
and press
Enter
.
3. Verify a response to the command entered.
4. Exit the serial communication session. Move the direct connect cable to each of
the remaining two serial ports and repeat steps 2 and 3.
Summary of Contents for SDU-2000
Page 12: ...12 SSU 2000 User s Guide 12713020 002 2 Revision D April 2004 ...
Page 18: ...18 SSU 2000 User s Guide 12713020 002 2 Revision D April 2004 ...
Page 390: ...SNMP Protocol 390 SSU 2000 User s Guide 12713020 002 2 Revision D April 2004 ...
Page 420: ...I O Connector Grounding 420 SSU 2000 User s Guide 12713020 002 2 Revision D April 2004 ...