3D-2 Propeller Shafts:
4) Remove the front output shaft (1) from the right
crankcase.
Installation
Install the front output shaft in the reverse order of
removal. Pay attention to the following points:
NOTE
Apply engine oil to each rotating part before
reassembling.
• Apply a small quantity of grease to the O-ring (1).
CAUTION
!
Replace the O-ring (1) with a new one.
: Grease 99000–25010 (SUZUKI SUPER
GREASE A or equivalent)
• Install the front output shaft to the right crankcase.
• Tighten the front output shaft bolts.
Front Output Shaft Disassembly and Assembly
B931H23406003
Refer to “Front Output Shaft Removal and Installation
(Page 3D-1)”.
Disassembly
1) Remove the C-ring (1) and snap ring (2).
Special tool
: 09900–06107 (Snap ring remover (Open
type))
2) Remove the front drive collar assembly (3), front
output shaft housing (4) and O-ring (5).
3) Remove the front drive collar (6) from the output oil
seal plate (7) with the special tool.
Special tool
(A): 09913–70210 (Bearing installer set (10
– 75))
4) Remove the O-ring (8).
1
I931H1340003-01
1
I931H1340005-01
I931H1340006-01
1
2
I931H1340007-01
5
4
3
I931H1340008-01
(A)
8
6
7
I931H1340009-03
Summary of Contents for 2009 LT-A500XP
Page 2: ......
Page 4: ......
Page 14: ...00 9 Precautions ...
Page 224: ...1E 3 Engine Lubrication System EXHAUST SIDE INTAKE SIDE I931H1150003 02 ...
Page 304: ...1K 4 Exhaust System ...
Page 346: ...2D 5 Wheels and Tires ...
Page 438: ...3D 26 Propeller Shafts ...
Page 482: ...4D 6 Parking Brake ...
Page 512: ...5A 28 Automatic Transmission ...
Page 624: ...Prepared by December 2008 Part No 99500 44080 03E Printed in U S A 624 ...