![Suzuki 2009 LT-A500XP Service Manual Download Page 299](http://html.mh-extra.com/html/suzuki/2009-lt-a500xp/2009-lt-a500xp_service-manual_1408817299.webp)
Charging System: 1J-12
Installation
Install the battery in the reverse order of removal.
Pay attention to the following point:
CAUTION
!
Never use anything except the specified
battery.
• Tighten the battery lead wire mounting bolts securely.
• Apply thread lock to the battery stay mounting bolts
and tighten them securely.
: Thread lock cement 99000–32110
(THREAD LOCK CEMENT SUPER 1322 or
equivalent)
Battery Visual Inspection
B931H21A06009
Inspect the battery in the following procedures:
1) Remove the seat. Refer to
“Seat Removal and
Installation: in Section 9D”
.
2) Visually inspect the surface of the battery container.
If any signs of cracking or electrolyte leakage from
the sides of the battery have occurred, replace the
battery with a new one.
If the battery terminals are found to be coated with
rust or an acidic white powdery substance, clean the
battery terminals with sandpaper.
3) Install the seat.
Specifications
Service Data
B931H21A07001
Battery
CAUTION
!
Never use anything except the specified battery.
Generator
I931H11A0028-01
Item
Specification
Note
Type designation
YTX20CH-BS
Capacity
12 V, 64.8 kC (18 Ah)/10 HR
Item
Specification
Note
Generator coil resistance
0.1 – 1.0
Ω
Generator maximum output
Approx. 400 W at 5 000 r/min
Generator no-load voltage
(When engine is cold)
70 V (AC) and more at 5 000 r/min
Regulated voltage
13.5 – 15.5 V at 5 000 r/min
Summary of Contents for 2009 LT-A500XP
Page 2: ......
Page 4: ......
Page 14: ...00 9 Precautions ...
Page 224: ...1E 3 Engine Lubrication System EXHAUST SIDE INTAKE SIDE I931H1150003 02 ...
Page 304: ...1K 4 Exhaust System ...
Page 346: ...2D 5 Wheels and Tires ...
Page 438: ...3D 26 Propeller Shafts ...
Page 482: ...4D 6 Parking Brake ...
Page 512: ...5A 28 Automatic Transmission ...
Page 624: ...Prepared by December 2008 Part No 99500 44080 03E Printed in U S A 624 ...