1D-8 Engine Mechanical:
3) Remove the throttle cable as shown in the cable
routing diagram. Refer to “Throttle Cable Routing
Diagram (Page 1D-1)”.
Installation
Install the throttle cables in the reverse order of removal.
Pay attention to the following points:
• Install the throttle cable as shown in the cable routing
diagram. Refer to “Throttle Cable Routing Diagram
(Page 1D-1)”.
• Check the throttle cable play and proper operation.
Throttle Cable Inspection
B931H21406008
Check that the throttle lever moves smoothly from full
open to full close. If it does not move smoothly, lubricate
the throttle cable.
Throttle Cable Play Inspection and Adjustment
B931H21406009
Refer to
“Throttle Cable Play Inspection and
Adjustment: in Section 0B”
.
Throttle Body Components
B931H21406010
I931H1140012-01
1
2
3
4
5
6
(a)
8
7
(b)
9
FWD
FWD
I931H1140290-03
1. Throttle body assembly
6. Cushion seal
: 2 N
⋅
m (0.2 kgf-m, 1.5 Ibf-ft)
2. ISC valve
7. Throttle cable cover
: Apply engine oil.
3. Fuel delivery pipe
8. Fuel delivery pipe mounting screw
: Do not reuse.
4. O-ring
9. ISC valve mounting screw
5. Fuel injector
: 5 N
⋅
m (0.5 kgf-m, 3.5 Ibf-ft)
Summary of Contents for 2009 LT-A500XP
Page 2: ......
Page 4: ......
Page 14: ...00 9 Precautions ...
Page 224: ...1E 3 Engine Lubrication System EXHAUST SIDE INTAKE SIDE I931H1150003 02 ...
Page 304: ...1K 4 Exhaust System ...
Page 346: ...2D 5 Wheels and Tires ...
Page 438: ...3D 26 Propeller Shafts ...
Page 482: ...4D 6 Parking Brake ...
Page 512: ...5A 28 Automatic Transmission ...
Page 624: ...Prepared by December 2008 Part No 99500 44080 03E Printed in U S A 624 ...