2-3
Installation Verification
Operator Manual
122994-513
❑
Glassware washer is positioned, as shown on equipment draw-
ing (122-992-953 for Reliance 400 or 122-993-554 for Reliance
500), with required clearance space and in relation to building
supply lines.
❑
Glassware washer is level. Use leveling legs, if necessary.
❑
If glassware washer is equipped with cold water pre-wash, drain
discharge cooldown or non-vented vapor condenser option,
building cold water line supplies water to glassware washer as
specified on equipment drawing.
❑
Building hot water line supplies water to glassware washer as
specified on equipment drawing.
❑
If glassware washer is steam-heated, building steam line pro-
vides steam to glassware washer as specified on equipment
drawing.
❑
If glassware washer is steam-heated, building condensate return
line is connected to glassware washer as specified on equip-
ment drawing.
❑
Pure water line supplies water to glassware washer as specified
on equipment drawing.
❑
Building air line supplies air to glassware washer as specified on
equipment drawing.
❑
Building waste line is connected to glassware washer as speci-
fied on equipment drawing.
❑
If vented glassware washer, building ventilation system is con-
nected to glassware washer as specified on equipment drawing.
❑
Electrical supply for glassware washer is as specified on equip-
ment drawing.
❑
Pressure for air, water and steam (if option applies) supplies is
within range specified on equipment drawing.
❑
Chemical injection pumps are connected to proper chemical
injection lines and each chemical suction tube and float are
placed in proper container.
❑
Chemical squeeze tubes have been lubricated.
❑
Floor underneath glassware washer has a noncombustible and
nonslip surface or is covered with a metal sheet extending to the
outer edges of the glassware washer.
❑
Walls surrounding glassware washer have a noncombustible
surface.
IMPORTANT:
After a few weeks of operation, inspect unit for
leaks. Retighten all clamps and connections.
WARNING – POSSIBLE FIRE
HAZARD: When glassware
washer is installed on a com-
bustible floor, floor must be
covered with a metal sheet
extending to the outer edges
of glassware washer.
Summary of Contents for RELIANCE 400
Page 6: ...iv 122994 513 Operator Manual Introduction Life Sciences Capital Equipment ...
Page 10: ...viii 122994 513 Operator Manual Table of Contents Life Sciences Capital Equipment ...
Page 12: ...x 122994 513 Operator Manual List of Illustrations Life Sciences Capital Equipment ...
Page 18: ...1 6 122994 513 Operator Manual Safety Precautions Life Sciences Capital Equipment ...
Page 24: ...2 6 122994 513 Operator Manual Installation Verification Life Sciences Capital Equipment ...
Page 30: ...3 6 122994 513 Operator Manual Component Identification Life Sciences Capital Equipment ...
Page 52: ...4 22 122994 513 Operator Manual Operating Instructions Life Sciences Capital Equipment ...
Page 105: ......