Section 5 Operation ...................................... 5-1
Performing Automatic Calibrations ....................... 5-1
Calibrating Multiple Analyzers in One Calibration ....... 5-1
Performing Manual Calibrations .......................... 5-2
Predefined Operator Stepped Manual Calibration .......... 5-2
Timer Stepped Manual Calibration ........................ 5-4
Viewing Calibration Status .............................. 5-5
Performing Manual Calibrations using the Status Screen
5-7
Viewing Diagnostic Information ........................ 5-10
The Analog Input Screen ................................. 5-10
The Analog Output Screen ............................... 5-11
The Internal Control Outputs and User Digital I/O Bits .. 5-11
Section 6 Model
2010D
Calibration Set-Up .................. 6-1
Set Up Gases ............................................ 6-2
Set Up Gas Standards ................................... 6-3
Diluent and Source Port Assignments .................... 6-4
Introduction to Initializing Calibration Sequences ...... 6-6
Defining Calibration Sequences .......................... 6-8
Setting up Sequence Points for Single-Gas Sequences
(Page 2 and 3) .......................................... 6-11
Setting up Sequence Points for Multi-Gas Sequences
(Page 2 and 5) .......................................... 6-14
Auto Calibration Set-up ................................. 6-19
Scheduling Automatic Calibrations ....................... 6-20
Digital I/O Group Set-up ................................ 6-21
Assigning Sequence Start Patterns ....................... 6-24
Assigning Point Start Patterns .......................... 6-25
Setting the Time and Date ............................... 6-27
Section 7 Serial Communications........................... 7-1
Operating Modes ........................................ 7-1
Prerequisites ........................................... 7-2
Configuring the Modem ................................... 7-3
Setting Up the Com Ports ................................ 7-4
Setting Up the Remote Terminal .......................... 7-6
Setting Up the Command Protocol ......................... 7-7
Configuring the Computer for Terminal Mode............... 7-9
Operating the Model
2010D
Remotely using Terminal Mode.... 7-11
Disconnecting ........................................... 7-12
Operating the Model
2010D
Remotely using Command Mode..... 7-13
The Monitor Labs Protocol ............................... 7-13
Number Representation (Floating Point) .................. 7-14
Digital Word Representation ............................. 7-14
Command Structure ....................................... 7-15
Starting and Ending Commands ............................ 7-15
Command Words ........................................... 7-15
Calibrator Address ...................................... 7-16
Data Fields ............................................. 7-16
Data Verification Fields ................................ 7-16
Summary of Contents for 2010D
Page 1: ...MODEL 2010D GAS DILUTION CALIBRATOR OPERATIONS MANUAL I N S T R U M E N T S...
Page 3: ......
Page 20: ...System Operations Page 3 2 Figure 3 1 The Model 2010D Front Panel...
Page 42: ...Installation Page 4 15 Figure 4 1 Rear Panel...
Page 63: ...Operation Page 5 7 Figure 5 5 The Dilution Status Screen Figure 5 6 The Ozone Status Screen...
Page 177: ...MODEL 2010D GAS DILUTION CALIBRATOR SCHEMATICS...
Page 178: ......