RADWIN
5000
HPMP
User
Manual
Release
3.5.70
3
‐
4
Additional
Outdoor
Site
Requirements
7.
Determine
the
ground
and
lightning
connection
points
of
the
installation.
The
ODU
and
PoE
must
both
be
grounded.
8.
Using
the
Ohmmeter,
measure
and
record
the
resistance
of
the
required
installation
to
the
grounding
point.
The
resistance
must
be
less
than
1O
ohm.
9.
Review
the
results
of
the
physical
site
survey.
Decide
if
the
site
is
suitable
for
the
wireless
network
installation.
•
If
the
site
is
suitable,
continue
with
stage
3,
the
RF
survey
•
If
the
site
is
not
suitable,
survey
another
site
Additional
Outdoor
Site
Requirements
The
ambient
outdoor
operating
temperature
should
be
‐
35
to
60
C
(
‐
31
to
140
F).
Additional
Indoor
Site
Requirements
The
ambient
operating
temperature
should
be
0
to
50°C
(32
to
122
°F)
at
a
humidity
of
up
to
90%,
non
condensing
Stage
3:
RF
Survey
The
RF
survey
examines
the
wireless
environment
of
the
installation
site,
to
determine
whether
there
are
available
channels
within
the
radio
operating
frequency
band.
An
RF
survey
is
performed
using
a
spectrum
analyzer.
It
is
advisable
to
familiarize
yourself
with
the
spectrum
analyzer
before
going
out
on
site,
specifically
the
Max
Hold
and
Marker
functions.
You
should
perform
the
RF
survey
at
each
of
the
proposed
sector
sites.
The
survey
should
be
carried
out
during
a
busy
time
of
day,
to
best
judge
the
worst
‐
case
radio
interference.
Allow
2
‐
4
hours
duration
for
a
good
RF
survey.
RF
Planning
for
Dense
Installations
and
Collocated
Sites
Interference
may
arise
from
•
Self
‐
interference
from
collocated
RADWIN
radios
•
Other
collocated
radio
devices
installed
on
the
same
site.
To
avoid
or
minimize
interference,
follow
these
recommendations:
•
For
collocated
RADWIN
units,
use
an
HSS
unit
to
synchronize
between
them.
Select
a
different
operating
channel
for
each
collocated
RADWIN
unit.
Summary of Contents for 5000 HPMP
Page 1: ...USER MANUAL RADWIN 5000 POINT TO MULTIPOINT BROADBAND WIRELESS Release 3 5 70...
Page 21: ...Part 1 Basic Installation Release 3 5 70...
Page 69: ...Part 2 Sector Installation Release 3 5 70...
Page 155: ...Part 3 Sector Management Release 3 5 70...
Page 197: ...RADWIN 5000 HPMP User Manual Release 3 5 70 8 42 Nomadic...
Page 252: ...RADWIN 5000 HPMP User Manual Release 3 5 70 11 8 Registering HMUs 3 Open the Air Interface tab...
Page 290: ...Part 4 Site Synchronization Release 3 5 70...
Page 319: ...RADWIN 5000 HPMP User Manual Release 3 5 70 16 7 Configuring the GSU...
Page 320: ...Part 5 Advanced Installation Topics Release 3 5 70...
Page 354: ...Part 6 Field Installation Topics Release 3 5 70...
Page 396: ...Part 7 Product Reference Release 3 5 70...
Page 517: ......