RADWIN
5000
HPMP
User
Manual
Release
3.5.70
4
‐
23
Installing
the
Base
Station
Figure
4
‐
29:
Exposing
the
tacky
side
of
the
sealing
tape
3.
After
connecting
the
short
CAT
‐
5e
IDU/ODU
cable
(provided
in
the
box)
from
the
ODU
to
the
unit,
tighten
the
cable
gland
cap
firmly
and
use
the
insulation
tape
scotch
23
to
fully
cover
both
of
the
cable
glands.
4.
Connect
the
tape
with
tacky
side
up
on
the
cable
gland
cap
and
the
CAT
‐
5e
cable.
Start
at
Start
Point
at
the
bottom
of
the
cable
gland
as
shown
in
Finish
at
End
Point
of
the
CAT
‐
5e
cable,
2.5cm
after
the
end
of
the
shrink
tubing.
Stretch
the
tape
and
apply
half
‐
overlapped
to
form
gap
‐
free
joint.
Figure
4
‐
30:
Start
and
End
points
for
protective
‐
taping
the
unit
5.
Wrap
two
layers
of
any
scotch
vinyl
plastic
electrical
type
(e.g
Scotch
Super
88
Vinyl
Plastic
Tape
from
3M)
to
protect
the
joints
as
shown
in
.
Ensure
that
the
bottom
of
the
cable
gland
and
the
end
of
the
CAT
‐
5e
cable
are
covered
with
the
sealing
splicing
tape
and
with
vinyl
plastic
tape.
Summary of Contents for 5000 HPMP
Page 1: ...USER MANUAL RADWIN 5000 POINT TO MULTIPOINT BROADBAND WIRELESS Release 3 5 70...
Page 21: ...Part 1 Basic Installation Release 3 5 70...
Page 69: ...Part 2 Sector Installation Release 3 5 70...
Page 155: ...Part 3 Sector Management Release 3 5 70...
Page 197: ...RADWIN 5000 HPMP User Manual Release 3 5 70 8 42 Nomadic...
Page 252: ...RADWIN 5000 HPMP User Manual Release 3 5 70 11 8 Registering HMUs 3 Open the Air Interface tab...
Page 290: ...Part 4 Site Synchronization Release 3 5 70...
Page 319: ...RADWIN 5000 HPMP User Manual Release 3 5 70 16 7 Configuring the GSU...
Page 320: ...Part 5 Advanced Installation Topics Release 3 5 70...
Page 354: ...Part 6 Field Installation Topics Release 3 5 70...
Page 396: ...Part 7 Product Reference Release 3 5 70...
Page 517: ......