Chapter 8: Installing, Removing, and Replacing Components
Removing and Replacing the Chassis
212
Quantum Scalar i40 and Scalar i80 User’s Guide
Figure 51 Reinstalled
Components
Ethernet
cable in LEFT
SCB port
Tape drive cables
Power supply
cord
13
Turn
ON
the library by pressing the power button on the front
panel.
14
Wait for the library to initialize. This can take up to 5 to 17 minutes,
depending on library size.
15
You will notice the library has a new diagnostic ticket (DT042)
stating the library’s vital product data (VPD) has changed.
16
Reconfigure host applications to support the new library VPD (serial
number, WWNN, and drive addresses).
17
If you had license keys installed on the old library, install the new
license keys. From the operator panel, select
Setup > License
Installation
; or from the Web client, select
Setup > License
. For
further directions, see
Applying a License Key
on page 70.
18
Run the Installation and Verification Test (IVT) to ensure the robot,
tape drives, and magazines are all functioning properly. From the
Summary of Contents for Scalar i40
Page 16: ...Figures xvi Quantum Scalar i40 and Scalar i80 User s Guide...
Page 18: ...Tables xviii Quantum Scalar i40 and Scalar i80 User s Guide...
Page 22: ...Preface xxii Quantum Scalar i40 and Scalar i80 User s Guide...
Page 26: ...Preface xxvi Quantum Scalar i40 and Scalar i80 User s Guide...
Page 328: ...Index 302 Quantum Scalar i40 and Scalar i80 User s Guide...