![Promise Technology VTRAK M610p Product Manual Download Page 25](http://html.mh-extra.com/html/promise-technology/vtrak-m610p/vtrak-m610p_product-manual_1617266025.webp)
Chapter 2: VTrak Installation
13
Making Management and Data Connections
Configuring Direct Attached Storage
This arrangement requires:
•
A network switch
•
A network interface card (NIC) in the PC
•
A SCSI HBA card in the PC
•
A SCSI cable that fits your HBA card and has a VHDCI connector to fit the
VTrak SCSI channel
Data Path
To establish the data path:
Connect a SCSI cable to the Host PC’s SCSI HBA card and one of the VTrak’s
SCSI channels.
VTrak’s SCSI connectors are bi-directional. However, the internal termination
feature works only on the “Out” connector. Internal termination is set to
Automatic
by default.
To use the internal termination feature, attach the SCSI cable to the “In”
connector. An external terminator is not required for this arrangement.
If you plan to connect multiple VTraks on a SCSI chain, connect the “Out”
connector of the same SCSI channel on the first VTrak to “In” connector of a
SCSI channel on the second VTrak.
See “Setting SCSI Termination” on page 60 or page 149 for more information.
Management Path
To establish the management path:
Connect the PC’s standard NIC and VTrak’s Management Port to your network
switch to establish the management path.
Summary of Contents for VTRAK M610p
Page 1: ...VTRAK M610p Product Manual Version 1 0 ...
Page 30: ...VTrak M610p Product Manual 18 ...
Page 44: ...VTrak M610p Product Manual 32 ...
Page 47: ...Chapter 4 Management with WebPAM PROe 35 Figure 1 The WebPAM PROe log in screen ...
Page 128: ...VTrak M610p Product Manual 116 ...
Page 184: ...VTrak M610p Product Manual 172 Shutdown complete It is now safe to power off the subsystem ...
Page 274: ...VTrak M610p Product Manual 262 ...