![Promise Technology VTRAK M610p Product Manual Download Page 19](http://html.mh-extra.com/html/promise-technology/vtrak-m610p/vtrak-m610p_product-manual_1617266019.webp)
7
Chapter 2: VTrak Installation
This chapter covers the following topics:
•
Unpacking the VTrak (below)
•
Mounting VTrak in a Rack (page 8)
•
Installing Disk Drives (page 10)
•
Making Management and Data Connections (page 13)
•
Making Serial Cable Connections (page 15)
•
Connecting the Power (page 16)
Unpacking the VTrak
The VTrak box contains the following items:
•
VTrak Unit
•
Quick Start Guide
•
Null Modem Cable
•
Left and right center-mount brackets
•
Left and right mounting rails
•
1.0m External VHDCI SCSI cable (2)
•
Screws for disk drives
(66, including 2 spares)
•
1.5m (4.9 ft) Power cords (2
for US and 2 for Europe)
•
CD with SNMP files,
Product
Manual
and
Quick Start Guide
Warning
The electronic components within the VTrak disk array are
sensitive to damage from Electro-Static Discharge (ESD).
Observe appropriate precautions at all times when handling the
VTrak or its subassemblies.
Important
Use the following categories of network cables with VTrak:
•
Cat 6, preferred
•
Cat 5E, minimum
Summary of Contents for VTRAK M610p
Page 1: ...VTRAK M610p Product Manual Version 1 0 ...
Page 30: ...VTrak M610p Product Manual 18 ...
Page 44: ...VTrak M610p Product Manual 32 ...
Page 47: ...Chapter 4 Management with WebPAM PROe 35 Figure 1 The WebPAM PROe log in screen ...
Page 128: ...VTrak M610p Product Manual 116 ...
Page 184: ...VTrak M610p Product Manual 172 Shutdown complete It is now safe to power off the subsystem ...
Page 274: ...VTrak M610p Product Manual 262 ...