
94
7
77
C3 Suspension on the Structure
Setting Up the Climbing Unit
Straight climbing units (Version 1)
Fold up the pre-assembled Foldable
Covers and attach to the Screen Ele-
ments.
1. Remove or secure all loose compo-
nents.
2. Install Crane Eye BR-2 2.5 t, see Sec-
tion "Assembly of Attachment Points"
on Page 69.
3. Installing Compression Brace, see
Section "Moving by Crane" on Page
41.
4. Attach guide ropes to the climbing en-
closure.
5. Attach crane lifting gear to Crane Eye
BR-2.
6. Align and lift the climbing unit.
(Fig. C3.01)
Permissible load per Crane Eye BR-2 2.5
t: max. 25 kN.
For moving heavy climbing units, use
Lifting Beam10 t. A compression brace
is, therefore, not required.
Follow Instructions for Use for the Lift-
ing Beam
9t
and Crane Eye BR-2!
Components
7
Crane Eye BR-2 2.5 t
77
Timber 120/100 mm
Fig. C3.01
LPS Screen Lightweight Climbing Enclosure
Instructions for Assembly and Use – Standard Configuration