
67
Additional Finishing Platforms
Finishing platforms can be provided in
the area of the bottom Slab Shoe.
For this, a finishing platform is bolted to
the Climbing Rail.
(Fig. B4.04)
The finishing platform is not covered by
the standard application. Separate static
proof is required! See "PERI Product In-
formation PI 314 D".
B4 Special Applications
Fig. B4.04
LPS Screen Lightweight Climbing Enclosure
Instructions for Assembly and Use – Standard Configuration