
123
90.6
10.5
90
10b
10.5
D5 Moving with the Climbing Device
Self-Climbing Procedure
Step 1
1. Remove Cover Mat from over the Slab
Shoe.
2. Position the Climbing Device LPS (90)
on the Bolts (10.5) of the middle Slab
Shoe (10b) and engage. The climbing
device is pressed against the Climbing
Rail through spring force. Guide the
claw into the Climbing Rail.
(Fig. D5.03 + D5.03a)
3. Attach twin hoses to the hydraulic
pump and create a short-circuit con-
nection at the other end by coupling
them together.
4. Switch on the hydraulic pump and
flush the hose for approx. 1 minute by
operating the hand valve.
5. Disconnect the hose ends from one
another and connect to the cylinder.
– Is the locking lever (90.6) engaged at
the cylinder base?
– No possibility of the hydraulic hoses
becoming entangled?
Components
2
Climbing Rail-2 LPS
10
Slab Shoe-2 LPS
10.5
Bolts
90
Climbing Device LPS 30 kN
90.6
Locking Lever
Fig. D5.03
Fig. D5.03b
Fig. D5.03a
LPS Screen Lightweight Climbing Enclosure
Instructions for Assembly and Use – Standard Configuration