68
2.3
2.4
2
C1 Pre-Assembly
General
For pre-assembly, there must be a suffi-
ciently large and level assembly area
available, as well as sufficient space for
intermediate storage.
Furthermore, a crane or other lifting
equipment is required.
Any intermediate status is to be correct-
ly secured by means of temporary sup-
ports to prevent any tipping over.
Assembly is carried out on aligned tim-
bers.
Preparation of the Climbing
Rails
Position Climbing Rails-2 LPS on tim-
bers. Observe centre of gravity position
with enclosure post.
Turn Climbing Rail so that the spacers
are on the underside.
Assembly of the spacers
In some cases, the additional installation
of a Spacer LPS (2.1) may be required as
a Climbing Bolt in the Climbing Rail, see
"Additional Spacers" on Page 31.
1. Position Spacer Tube M20 Ø 30x52
(2.3) of the Spacer M20 in the Climb-
ing Rail-2 LPS by means of a hammer.
2. Turn Climbing Bolts LPS M20 (2.4) on
both sides through the holes Ø 21 on
the Climbing Rail into the Spacer Tube
M20.
3. Tighten all Climbing Bolts with Allen
Key SW 10. Tightening torque min.
60 Nm.
(Fig. C1.01 + C1.02)
Has the Climbing Bolt been tightened?
Only use the specified original PERI
Climbing Bolt!
Components
2
Climbing Rail-2 LPS
2.3
Spacer Tube LPS
2.4
Climbing Bolt LPS M20
Fig. C1.01
Fig. C1.02
LPS Screen Lightweight Climbing Enclosure