22
A4 Operating Sequence
Version 2
Climbing enclosure with working plat-
form.
The slab formwork is in the way for the
climbing procedure. PERI recommends
a slab formwork system, e.g. SKYDECK,
which allows early striking.
Example
Operating sequence with SKYDECK
Slab Formwork.
Step 1
Climbing enclosure is in position.
Close cover flaps.
Concrete the columns.
Step 2
Erect slab formwork with stopends.
Install leading anchor with the aid of the Slab
Anchor Template.
Fig. A4.05
Fig. A4.06
LPS Screen Lightweight Climbing Enclosure
Instructions for Assembly and Use – Standard Configuration