
42
32
81, 86
33
34
35
35.5
73
B2 Planning the Units
Platform Cantilever Beam and
Platform Decking
Platform decking
Load Class 2 working scaffold
corresponding to DIN EN 12811-1,
max. load 150 kg/m².
Pre-assembled platforms (33) are bolted
to the Platform Beam (34) with Bolts
M10x25 (73) and Nuts (73.1) on the Plat-
form Cantilever Beam LPS (32) (2x per
Platform Cantilever Beam).
Platform Cantilever Beam LPS (32) and
mounted platform (33) are bolted to the
Climbing Rail (2) and Enclosure Post (4)
with Fitting Pins Ø 21x120 (81) and Cot-
ter Pins 4/1 (86).
(Fig. B2.05)
Assembly of platform (33) and Platform
Cantilever Beam (32) takes place during
pre-assembly. Platform extensions, con-
sisting of Platform Beam LPS (34) and
Platform Cover LPS (35), are only in-
stalled on the construction site.
When using planking with a lower
strength class or plywood sheets,
– a more exact static proof is required!
– other mounting bolts M10 are to be
used.
Components
32
Platform Cantilever Beam LPS
33
Platform LPS
34
Platform Beam LPS
35
Platform Beam LPS
35.5
Platform Cover LPS 37.5 x 107.5
73
Oval-Head Screw ISO 7380
M10x25-10.9
73.1
Nut ISO 7040 M10-8
81
Fitting Pin Ø 21x120
86
Cotter Pin 4/1
Fig. B2.05
View from below
LPS Screen Lightweight Climbing Enclosure
Instructions for Assembly and Use – Standard Configuration