
23
A4 Operating Sequence
Step 3
Concrete the slab.
Fold up the Slab Anchor Template.
Rework slab.
Assemble subsequent guardrails.
Step 4
Mount top slab shoe.
Strip slab formwork and back-prop.
Open cover flaps.
Climb climbing enclosure hydraulically (as depicted
above) or by crane.
Dismantle bottom slab shoe.
Fig. A4.07
Fig. A4.08
LPS Screen Lightweight Climbing Enclosure
Instructions for Assembly and Use – Standard Configuration