100
10b
10.3
10.6
10.6
C3 Suspension on the Structure
5. Continue to relieve the crane lifting
gear and thereby insert the Climbing
Rail into the bottom Climbing Shoe
(10b).
6. Close the folding runners (10.3) of
the bottom Climbing Shoe and se-
cure.
7. Align climbing unit.
8. Tighten guiding brackets (10.6) of all
Slab Shoes.
9. Raise climbing unit approx. 10 cm.
10. Activate the climbing pawls of the
bottom Slab Shoe and deactivate the
top Slab Shoe. (Fig. C3.07)
11. Completely relieve crane and release
crane lifting gear from a safe posi-
tion.
Components
2.1
Spacer LPS 52
10
Slab Shoe-2 LPS 10 t
10.2
Climbing Pawl
10.3
Folding Runners
10.6
Guiding Bracket
Fig. C3.07
LPS Screen Lightweight Climbing Enclosure
Instructions for Assembly and Use – Standard Configuration