
Parallel I/O connection
ZW User's Manual
161
6
Commun
ication
s with Exte
rnal De
vi
ces
Bank Switching
Explanation of operations
(1) The BANK_SEL signal is switched to the bank number to switch to.
(2) After the input response time, the measurement stops and the BUSY output is turned ON, then the bank
switching operation is started.
(3) After bank switching ends, the BUSY output is turned OFF and the BANK_ OUT output is switched.
(4) Measurement is restarted and the ENABLE output is turned ON.
Item
Min.
Max.
T7
Input response time
200 ms
T8
Bank switching time
100 ms
T9
Measurement start response time
3×T0
Depends on the set conditions
(1)
(2)
T7
BA
N
K_SEL inp
u
t
(BA
N
K_SEL1/2/3)
T
8
(3)
(4)
T9
O
N
OFF
O
N
OFF
Meas
u
rement
BUSY o
u
tp
u
t
E
N
ABLE o
u
tp
u
t
BA
N
K_OUT o
u
tp
u
t
(BA
N
K_OUT1/2/3)
Clamp
Meas
u
rement
Meas
u
rement
Summary of Contents for ZW-C1*T
Page 70: ...Operating with Sensor Controller 68 ZW User s Manual MEMO ...
Page 116: ...Setting the System 114 ZW User s Manual MEMO ...
Page 134: ...Controll input signal with PC tool 132 ZW User s Manual MEMO ...
Page 209: ...8 Troubleshooting Troubleshooting 8 1 Error Messages 208 8 2 Troubleshooting 210 ...
Page 319: ...Index ZW User s Manual 317 Index 11 ...
Page 321: ......