EN-5
Installation
Mechanical Installation
Unpacking the Inverter
Check the following items after unpacking the inverter.
If you find any irregularities in the above items, contact the agency from which you purchased the Inverter or
your Omron-Yaskawa Motion Control representative immediately.
Checking the Installation Site
Before installing the inverter check the following:
•
Make sure that the ambient temperature is not exceeded
•
Install the Inverter in a clean location which is free from oil mist and dust. It can be installed in a totally
enclosed panel that is completely shielded from floating dust.
•
When installing or operating the Inverter, always take special care so that metal powder, oil, water, or other
foreign matter does not get into the Inverter.
•
Do not install the Inverter on combustible material, such as wood.
•
Install the Inverter in a location free from radioactive materials and combustible materials.
•
Install the Inverter in a location free from harmful gasses and liquids.
•
Install the Inverter in a location without excessive oscillation.
•
Install the Inverter in a location free from chlorides.
•
Install the Inverter in a location free from direct sunlight.
Installation Orientation
Install the Inverter vertically so as not to reduce the cooling effect. When installing the Inverter, always pro-
vide the following installation space to allow normal heat dissipation.
Item
Method
Has the correct model of Inverter been delivered?
Check the model number on the nameplate on the side of the Inverter.
Is the Inverter damaged in any way?
Inspect the entire exterior of the Inverter to see if there are any scratches or other
damage resulting from shipping.
Are any screws or other components loose?
Use a screwdriver or other tools to check for tightness.
1. The same space is required horizontally and vertically for IP00, IP20 and NEMA 1 Inverters.
2. Always remove the top protection cover after installing an Inverter with an output of 18.5 kW or less in a
panel.
Always provide enough space for suspension eye bolts and the main circuit lines when installing an
Inverter with an output of 22 kW or more in a panel.
A
50 mm min.
30 mm min.
30 mm min.
B
120 mm min.
Air
Air
Vertical Space
Horizontal Space
A
B
50 mm
120 mm
IMPORTANT
Summary of Contents for CIMR-L7
Page 33: ...EN 31...
Page 65: ...DE 31...
Page 97: ...ES 31...
Page 129: ...FR 31...
Page 161: ...IT 31...
Page 193: ...PT 31...
Page 195: ...RU 1 Varispeed L7 5 LC RC...
Page 198: ...RU 4 2 Omron Yaskawa Motion Control Omron Yaskawa Motion Control 3 20...
Page 199: ...RU 5 Omron Yaskawa Motion Control 1 IP00 IP20 NEMA 1 2 18 5 22 50 30 30 B 120 B 50 120...
Page 200: ...RU 6 R L1 S L2 T L3 R S T 600 PE L1 L2 L3 PE GND L1 L2 L3 GND U V W M 3...
Page 209: ...RU 15 Data Invalid 50 150 27 1 2 3 4 5 BB BB1 6 7 8 9 STOP 1 2 3 4 END 60 2...
Page 215: ...RU 21 d1 18 2 d1 18 1 H1 83 d1 18 2 H1 83 d1 17 H1 K80 d1 18 2 d1 09 1 2 FRL FRL S3 09 0...
Page 217: ...RU 23 5 DOWN DOWN n5 05 0 P 1 UP DOWN 2 n5 01 3 n5 05 0 4 5...
Page 225: ...RU 31...