5.Operation
Test operation (installation, wiring, and JOG Operation)
5-6
5.2
Test operation
1) Confirmation of installation and wiring
Confirm the installation and the wiring of the driver and the motor.
Procedure
Item and contents
1
Installation
■
Install the driver and the motor by referring to [Installation (3)].
Do not connect any load to the motor.
2
Wiring, connecting
Turning on the power supply
■
Wire the power supply, motor and upper device by referring to [Wiring (4)].
Do not connect CN1 to the driver.
■
Turn on the power supply. Confirm that there is no alarm code displayed at the upper center
of the driver display.
If there is one, follow the instructions in [Trouble shooting When Alarm Occurs (8-7).
■
Follow
“
Trouble shooting (8-1)
”
, if the 7 segment LED does not light
“
≡
”
when powered up.
2) Confirmation of movement
Perform JOG Operation by using the setup software or the digital operator.
Procedure
Item and contents
1
Estimation of magnetic pole position
■
Perform the estimation of magnetic pole position at no load without connecting any load to
the motor.
■
The motor should start, allowing estimation of magnetic pole position.
◆
Operating using setup software:
Select the Magnetic Pole Position Estimation option from the Test Operation menu.
2
JOG Operation
■
Perform JOG-operation.
■
Confirm that the motor rotates CW direction and CCW direction
◆
Operating using setup software:
Select JOG Operation from the Test Operation menu.
◆
Confirming and setting with Digital Operator:
For operating instructions, please see [Digital Operator (7)].
Load
Megatorque
motor
MEGATORQUE
MOTOR
Do not connect